Sudden Drop in Dust Test Chamber Efficiency: The Triple Gate of Technology, Management, and Asset ——A Systematic Diagnostic Report for Laboratory Managers and Equipment Engineers
During the past twelve months, several third-party testing bodies and OEM laboratories reported the same problem: when running dust tests in accordance with GB/T 4208, IEC 60529 or MIL-STD-810, the batch cycle has stretched from 48 h to 72 h, even 96 h, while energy consumption has risen by more than 30 %.
2025-09-26