The sand and dust test chamber is used to evaluate the sealing performance of factory-produced products by simulating the erosion caused by natural wind and sand climates. So, how should the equipment be installed correctly? Read on to find out.

There are two key considerations when placing test samples in the chamber:

The volume of the test sample must not exceed 20% of the chamber’s internal volume, and the sample’s base should not cover more than 45% of the normal operating area’s horizontal surface.

If the sample’s size does not meet the above requirement, the relevant standards specify the following three alternative measures:

① Select representative core components of the product, such as doors, vents, mounts, sealing shafts, etc.
② Test another sample with the same structural design details as the original product.
③ Independently test the parts of the product that must remain sealed.

sand and dust test chamber
Based on the necessary conditions for the equipment’s normal operation, sample enclosures can be classified into two structural types:

Structure 1: During normal operation, the internal pressure of the product enclosure may differ from the external atmospheric pressure. For samples with Structure 1 enclosures, they should be placed inside the chamber and installed in their normal operating position. Since the vacuum pump connected to the chamber will reduce the internal pressure below atmospheric pressure, the sample enclosure must have a suitable opening. If the enclosure already has a drain hole, the vacuum tube should be connected to it without additional drilling. If there are multiple drain holes, the vacuum tube should be connected to one of them, while the others must remain sealed during testing.

Structure 2: The internal pressure of the sample enclosure is the same as the external atmospheric pressure. For samples with Structure 2 enclosures, they can be directly placed inside the chamber and installed in their normal operating position, with all openings remaining unobstructed.

The placement and requirements for samples in the sand and dust test chamber vary depending on the product type. We hope this guide proves helpful to you.

News Recommendation
The high and low temperature test chamber is a high-precision instrument. Operators must strictly follow the procedures during use, and regular maintenance is essential. Improper operation or lack of maintenance can lead to malfunctions, affecting work progress.
With rapid economic growth and continuous technological advancements, the scientific and technological sophistication of temperature & humidity cycling test chambers has been steadily increasing.
When a company changes its production location and needs to relocate a thermal shock test chamber, the following precautions must be taken to minimize potential damage to the equipment.
The high-low temperature test chamber is the cornerstone of environmental reliability testing. Its cooling rate dictates test duration and data validity. Field data from 500+ chambers over ten years show that “slow cooling” accounts for 38 % of all malfunctions, second only to “no cooling”.
The performance of the compressor in a high-low temperature alternating test chamber directly affects the efficiency of the equipment and the test results. Therefore, customers should choose a high-quality compressor to enhance the device's performance. So, how can you determine whether the compressor in the test equipment is good or bad?