Search for the product you are looking for
研发中心

News

Slide down

How to Set the Timer Controller of a Sand and Dust Test Chamber

Source:LINPIN Time:2025-05-06 Category:Industry News

How are the parameters of the sand and dust test chamber timer controller set? Here’s a guide: Today, we’ll share the detailed steps for operating the timer controller.

Before operating the timer controller of the sand and dust test chamber, ensure that the power is connected, as these operations must be performed with the power on. Initially, the controller display will show the main menu: Run, Function Block, Clear Program, etc.
sand and dust test chamber

Access the Function Block

Press the Up/Down Arrow keys to move the cursor to Function Block, then press OK (Confirm).
The screen will display “T1” (Test Time) in the lower right corner, with the cursor blinking on “T1”.
Set the Test Time (T1)

Press the Left/Right Arrow keys to move the blinking cursor to the time setting position.
Observe the time unit displayed in the upper left corner of the screen.
Press SEL, then use the Up/Down Arrow keys to adjust the desired time value.
Press OK to confirm, and the cursor will return to “T1”.
Set Blowing Dust Time (T2)

Press the Up Arrow and SEL keys simultaneously—the screen will display “T2” (Blowing Dust Time, recommended: 5 minutes).
Follow the same method as T1 to set the time.
Set Blowing Dust Stop Time (T3)

Press the Up Arrow—the screen will display “T3” (Stop Blowing Dust Time, recommended: 2 minutes).
Set it using the same method as T1.
Set Vibration and Power Times (T4-T7)

T4: Vibration Time (recommended: 0.5 seconds).
T5: Stop Vibration Time (recommended: 2 minutes).
T6: Power-On Time (set according to relevant standards).
T7: Power-Off Time (also set according to standards).
Complete Setup and Start the Test

After setting all 7 time parameters, press ESC (Exit) to return to the main menu.
Use the Up Arrow to move the cursor to “Run”, then press OK—”Run” will change to “Stop”, and the internal power will activate.
The temperature controller will display readings. Press ESC again to return to the control screen.
Begin the Test

Turn on the “Blowing Dust” and “Vibration” switches—the device will start working.
To begin the test, turn on the “Sample” switch.
That’s all for the operation steps of the sand and dust test chamber timer controller. By reading this guide, you should now have a clear understanding of the process.

News Recommendation
Now that winter has arrived and snow has begun to fall in some areas, how can companies properly maintain their UV aging test chambers while in use?
The cold and hot shock test chamber is an effective device for detecting the performance of electronic components under rapidly changing temperature conditions. Many materials are tested using this equipment. To ensure the accuracy of the test results, it is necessary to clean the test specimens before the test chamber is operated.
If a constant temperature and humidity test chamber malfunctions due to improper operation or lack of maintenance, it will not only affect the progress of work but also incur costs much higher than those of regular maintenance.
Ozone aging test chambers are indispensable instruments in the field of material anti-aging testing. Common types include ozone aging test equipment and ultraviolet aging test equipment.
Modern high-temperature test chambers are significantly safer than traditional models due to enhanced safety protection measures and optimized design. So, what specific safety features and protections do these devices offer?
Product Recommendation
Telegram WhatsApp Facebook VK LinkedIn