How to Set the Timer Controller of a Sand and Dust Test Chamber

Source:LINPIN Time:2025-05-06 Category:Industry News

How are the parameters of the sand and dust test chamber timer controller set? Here’s a guide: Today, we’ll share the detailed steps for operating the timer controller.

Before operating the timer controller of the sand and dust test chamber, ensure that the power is connected, as these operations must be performed with the power on. Initially, the controller display will show the main menu: Run, Function Block, Clear Program, etc.
sand and dust test chamber

Access the Function Block

Press the Up/Down Arrow keys to move the cursor to Function Block, then press OK (Confirm).
The screen will display “T1” (Test Time) in the lower right corner, with the cursor blinking on “T1”.
Set the Test Time (T1)

Press the Left/Right Arrow keys to move the blinking cursor to the time setting position.
Observe the time unit displayed in the upper left corner of the screen.
Press SEL, then use the Up/Down Arrow keys to adjust the desired time value.
Press OK to confirm, and the cursor will return to “T1”.
Set Blowing Dust Time (T2)

Press the Up Arrow and SEL keys simultaneously—the screen will display “T2” (Blowing Dust Time, recommended: 5 minutes).
Follow the same method as T1 to set the time.
Set Blowing Dust Stop Time (T3)

Press the Up Arrow—the screen will display “T3” (Stop Blowing Dust Time, recommended: 2 minutes).
Set it using the same method as T1.
Set Vibration and Power Times (T4-T7)

T4: Vibration Time (recommended: 0.5 seconds).
T5: Stop Vibration Time (recommended: 2 minutes).
T6: Power-On Time (set according to relevant standards).
T7: Power-Off Time (also set according to standards).
Complete Setup and Start the Test

After setting all 7 time parameters, press ESC (Exit) to return to the main menu.
Use the Up Arrow to move the cursor to “Run”, then press OK—”Run” will change to “Stop”, and the internal power will activate.
The temperature controller will display readings. Press ESC again to return to the control screen.
Begin the Test

Turn on the “Blowing Dust” and “Vibration” switches—the device will start working.
To begin the test, turn on the “Sample” switch.
That’s all for the operation steps of the sand and dust test chamber timer controller. By reading this guide, you should now have a clear understanding of the process.

News Recommendation
Although both thermal-shock and steady-state temperature/humidity tests fall under the umbrella of “weathering verification”, they differ fundamentally in physical modelling, control logic and safety strategy.
When a cold and hot shock test chamber, which has been running smoothly, suddenly stops cooling, what could be the reason?
Cold and thermal shock test chamber on the market is divided into two categories, a two-compartment type, including high-temperature region and low-temperature region, the test object were tested in two different temperatures in the area of the test, alternating hot and cold test; the other is a three-compartment type, in addition to high-temperature and low-temperature areas, there is also a test area, and the difference between the two-compartment is that the three-compartment type does not need to be tested directly in the test area.
The performance indicators of a high and low temperature test chamber are crucial because they directly affect the reliability of test results, the breadth of application scenarios, and the effectiveness of quality assurance for products.
Certain factors can impact the effectiveness of UV aging test chambers. Therefore, it is essential to remain vigilant and pay close attention to these factors during equipment operation. By continuously monitoring and improving these aspects, the efficiency of the equipment can be enhanced. Below, we examine these influencing factors.
Product Recommendation
Telegram WhatsApp Facebook VK LinkedIn